error
Kurzer Serviceunterbruch am Donnerstag, 16. April 2026, 12 bis 13 Uhr. Sie können in diesem Zeitraum keine neuen Dokumente hochladen oder bestehende Einträge bearbeiten. Das Login wird in diesem Zeitraum deaktiviert. Grund: Wartungsarbeiten // Short service interruption on Thursday, April 16, 2026, 12.00 – 13.00. During this time, you won’t be able to upload new documents or edit existing records. The login will be deactivated during this time. Reason: maintenance work
 

Dynamic railway timetable rescheduling for multiple connected disruptions


METADATA ONLY
Loading...

Date

2021-04

Publication Type

Journal Article

ETH Bibliography

no

Citations

Altmetric
METADATA ONLY

Data

Rights / License

Abstract

Unexpected disruptions occur in the railways on a daily basis, which are typically handled manually by experienced traffic controllers with the support of predefined contingency plans. When several disruptions occur simultaneously, it is rather hard for traffic controllers to make rescheduling decisions, because (1) the predefined contingency plans corresponding to these disruptions may conflict with each other and (2) no predefined contingency plan considering the combined effects of multiple disruptions is available. This paper proposes a Mixed Integer Linear Programming (MILP) model to reschedule the timetable in case of multiple disruptions that occur at different geographic locations but have overlapping periods and are pairwise connected by at least one train line. The dispatching measures of retiming, reordering, cancelling, adding stops and flexible short-turning are formulated in the MILP model that also considers the rolling stock circulations at terminal stations and platform capacity. We develop two approaches for rescheduling the timetable in a dynamic environment: the sequential approach and the combined approach. In the sequential approach, a single-disruption rescheduling model is applied to handle each new disruption with the last solution as reference. In the combined approach, the multiple-disruption rescheduling model is applied every time an extra disruption occurs by considering all ongoing disruptions. A rolling-horizon solution method to the multiple-disruption model has been developed to handle long multiple connected disruptions in a more efficient way. The sequential and combined approaches have been tested on real-life instances on a subnetwork of the Dutch railways with 38 stations and 10 train lines operating half-hourly in each direction. In a few cases, the sequential approach did not find feasible solutions, while the combined approach obtained the solutions for all considered cases. Besides, the combined approach was able to find solutions with less cancelled train services and/or train delays than the sequential approach. For long disruptions, the proposed rolling-horizon method was able to generate high-quality rescheduling solutions in an acceptable time.

Publication status

published

Editor

Book title

Volume

125

Pages / Article No.

103080

Publisher

Pergamon

Event

Edition / version

Methods

Software

Geographic location

Date collected

Date created

Subject

Railways; Timetable rescheduling; Disruption management; Multiple connected disruptions; Rolling horizon

Organisational unit

09611 - Corman, Francesco / Corman, Francesco check_circle
02655 - Netzwerk Stadt u. Landschaft ARCH u BAUG / Network City and Landscape ARCH and BAUG

Notes

Funding

Related publications and datasets