Show simple item record

dc.contributor.author
Hoghooghi, Hadi
dc.contributor.author
Chokani, Ndaona
dc.contributor.author
Abhari, Reza S.
dc.date.accessioned
2021-03-03T07:30:47Z
dc.date.available
2020-09-21T19:54:04Z
dc.date.available
2020-09-22T06:22:41Z
dc.date.available
2021-03-03T07:28:38Z
dc.date.available
2021-03-03T07:30:47Z
dc.date.issued
2020-09
dc.identifier.other
10.1088/1742-6596/1618/2/022008
en_US
dc.identifier.uri
http://hdl.handle.net/20.500.11850/441732
dc.identifier.doi
10.3929/ethz-b-000441732
dc.format
application/pdf
en_US
dc.language.iso
en
en_US
dc.publisher
The Electrochemical Society
en_US
dc.rights.uri
http://creativecommons.org/licenses/by/3.0/
dc.title
Individual Blade Pitch Control for Extended Fatigue Lifetime of Multi-Megawatt Wind Turbines
en_US
dc.type
Conference Paper
dc.rights.license
Creative Commons Attribution 3.0 Unported
ethz.journal.volume
1618
en_US
ethz.journal.issue
2
en_US
ethz.pages.start
022008
en_US
ethz.size
12 p.
en_US
ethz.version.deposit
publishedVersion
en_US
ethz.event
European Academy for Wind Energy's Torque conference (TORQUE 2020)
en_US
ethz.event.location
(online)
en_US
ethz.event.date
September 28 - October 2, 2020
en_US
ethz.notes
Due to the Coronavirus (COVID-19) the conference was conducted virtually.
en_US
ethz.identifier.wos
ethz.identifier.scopus
ethz.publication.place
Bristol
en_US
ethz.publication.status
published
en_US
ethz.leitzahl
ETH Zürich::00002 - ETH Zürich::00012 - Lehre und Forschung::00007 - Departemente::02130 - Dep. Maschinenbau und Verfahrenstechnik / Dep. of Mechanical and Process Eng.::02668 - Inst. f. Energie- und Verfahrenstechnik / Inst. Energy and Process Engineering::03548 - Abhari, Reza S. / Abhari, Reza S.
en_US
ethz.leitzahl.certified
ETH Zürich::00002 - ETH Zürich::00012 - Lehre und Forschung::00007 - Departemente::02130 - Dep. Maschinenbau und Verfahrenstechnik / Dep. of Mechanical and Process Eng.::02668 - Inst. f. Energie- und Verfahrenstechnik / Inst. Energy and Process Engineering::03548 - Abhari, Reza S. / Abhari, Reza S.
en_US
ethz.relation.isPartOf
10.3929/ethz-b-000492802
ethz.date.deposited
2020-09-21T19:54:23Z
ethz.source
FORM
ethz.eth
yes
en_US
ethz.availability
Open access
en_US
ethz.rosetta.installDate
2021-03-03T07:28:48Z
ethz.rosetta.lastUpdated
2022-03-29T05:33:18Z
ethz.rosetta.exportRequired
true
ethz.rosetta.versionExported
true
ethz.COinS
ctx_ver=Z39.88-2004&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.atitle=Individual%20Blade%20Pitch%20Control%20for%20Extended%20Fatigue%20Lifetime%20of%20Multi-Megawatt%20Wind%20Turbines&rft.date=2020-09&rft.volume=1618&rft.issue=2&rft.spage=022008&rft.au=Hoghooghi,%20Hadi&Chokani,%20Ndaona&Abhari,%20Reza%20S.&rft.genre=proceeding&rft_id=info:doi/10.1088/1742-6596/1618/2/022008&rft.btitle=Individual%20Blade%20Pitch%20Control%20for%20Extended%20Fatigue%20Lifetime%20of%20Multi-Megawatt%20Wind%20Turbines
 Search print copy at ETH Library

Files in this item

Thumbnail
Thumbnail

Publication type

Show simple item record