Metadata only
Date
1996Type
- Journal Article
ETH Bibliography
yes
Altmetrics
Abstract
Dynamic experiments conducted in a pilot scale settling tank at Zurich's wastewater treatment plant (WWTP) are presented. The experiments were carried out with real activated sludge. They showed that vertical perforated walls transverse to the main flow direction are very beneficial particularly for wet-weather flow. The increase of the effluent suspended solids concentration is significantly dampened with dynamic hydraulic loading. Installing several perforated walls enables uniform velocity profiles to be attained, enhancing flocculation. The total sludge mass stored in the final settling tank may be increased by this system and requires special attention when the removal system is designed. Show more
Publication status
publishedExternal links
Journal / series
Water Science & TechnologyVolume
Pages / Article No.
Publisher
IWA PublishingSubject
Dynamic loading; Effluent quality; Final settling tanks; Flocculation; Sedimentation; Sedimentation efficiency; Sludge blanket behaviour; Wet-weather flowOrganisational unit
03820 - Boes, Robert / Boes, Robert
More
Show all metadata
ETH Bibliography
yes
Altmetrics