Determination of costpotential-curves for wind energy in the German federal state of Baden-Württemberg
Metadata only
Date
2013-06Type
- Journal Article
ETH Bibliography
no
Altmetrics
Abstract
The new federal government in the German federal state of Baden-Württemberg has set a target for 10% of gross electricity generation from wind energy by 2020. Given that currently around 0.1% of the electricity generation comes from wind energy, this paper examines the technical feasibility and economic costs associated with realising this goal. The technical potential for wind energy in Baden-Württemberg is determined, along with the costs of electricity generation, which together lead to the derivation of costpotential-curves. The technical potential is calculated by identifying the available area with the aid of a geographical information system (GIS) and land use information. With the help of a regional wind atlas, turbine power curves and an assumed wind speed frequency distribution, the spatially distributed electricity generation potential on a district level is estimated. The costs of wind energy are investigated for the year 2010 and projected for the years 2020 and 2030 on the basis of learning curves. The result is a suitable area for wind energy of 2119km, which amounts to 5.9% of the total area of Baden-Württemberg. Depending on the wind turbine selected, a capacity of 18.5GW up to 24.5GW could be installed and depending on the hub height and the turbine, an electricity yield of 29.3TWh up to 40.7TWh could be generated. The costs of electricity, depending on the type of turbine and the average wind speed, but lie for 2010 between 3.99 and 21.42€-cents/kWh, reducing by 2030 to 3.3317.84€-cents/kWh. Show more
Publication status
publishedExternal links
Journal / series
Energy PolicyVolume
Pages / Article No.
Publisher
ElsevierSubject
Wind energy; Renewable goals; Cost–potential-curvesOrganisational unit
09752 - McKenna, Russell / McKenna, Russell
More
Show all metadata
ETH Bibliography
no
Altmetrics