Understanding the Timetable Planning Process as a Closed Control Loop
dc.contributor.author
Lüthi, Marco
dc.contributor.author
Hürlimann, Daniel
dc.contributor.author
Nash, Andrew
dc.date.accessioned
2017-06-10T15:21:01Z
dc.date.available
2017-06-10T15:21:01Z
dc.date.issued
2005
dc.identifier.uri
http://hdl.handle.net/20.500.11850/65096
dc.language.iso
en
dc.subject
Timetable planning process
dc.subject
Railroad scheduling
dc.subject
Railway simulation
dc.title
Understanding the Timetable Planning Process as a Closed Control Loop
dc.type
Other Conference Item
ethz.journal.title
Proceedings of the 1st International Seminar on Railway Operations Modelling and Analysis
ethz.event
1st International Seminar on Railway Operations Modelling and Analysis
ethz.event.location
Delft, Netherlands
ethz.event.date
June 8-10, 2005
ethz.publication.place
ethz.publication.status
published
ethz.leitzahl
ETH Zürich::00002 - ETH Zürich::00012 - Lehre und Forschung::00007 - Departemente::02115 - Dep. Bau, Umwelt und Geomatik / Dep. of Civil, Env. and Geomatic Eng.::02610 - Inst. f. Verkehrspl. u. Transportsyst. / Inst. Transport Planning and Systems::03674 - Weidmann, Ulrich / Weidmann, Ulrich
ethz.leitzahl
ETH Zürich::00002 - ETH Zürich::00012 - Lehre und Forschung::00007 - Departemente::02100 - Dep. Architektur / Dep. of Architecture::02655 - Netzwerk Stadt und Landschaft D-ARCH::02226 - NSL - Netzwerk Stadt und Landschaft / NSL - Network City and Landscape
*
ethz.leitzahl
ETH Zürich::00002 - ETH Zürich::00012 - Lehre und Forschung::00007 - Departemente::02100 - Dep. Architektur / Dep. of Architecture::02655 - Netzwerk Stadt u. Landschaft ARCH u BAUG / Network City and Landscape ARCH and BAUG
*
ethz.leitzahl.certified
ETH Zürich::00002 - ETH Zürich::00012 - Lehre und Forschung::00007 - Departemente::02115 - Dep. Bau, Umwelt und Geomatik / Dep. of Civil, Env. and Geomatic Eng.::02610 - Inst. f. Verkehrspl. u. Transportsyst. / Inst. Transport Planning and Systems::03674 - Weidmann, Ulrich / Weidmann, Ulrich
ethz.date.deposited
2017-06-10T15:24:34Z
ethz.source
ECIT
ethz.identifier.importid
imp593650756450f18803
ethz.ecitpid
pub:103550
ethz.eth
yes
ethz.availability
Metadata only
ethz.rosetta.installDate
2017-07-15T16:03:12Z
ethz.rosetta.lastUpdated
2025-02-06T19:34:11Z
ethz.rosetta.versionExported
true
ethz.COinS
ctx_ver=Z39.88-2004&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.atitle=Understanding%20the%20Timetable%20Planning%20Process%20as%20a%20Closed%20Control%20Loop&rft.jtitle=Proceedings%20of%20the%201st%20International%20Seminar%20on%20Railway%20Operations%20Modelling%20and%20Analysis&rft.date=2005&rft.au=L%C3%BCthi,%20Marco&H%C3%BCrlimann,%20Daniel&Nash,%20Andrew&rft.genre=unknown&
Files in this item
Files | Size | Format | Open in viewer |
---|---|---|---|
There are no files associated with this item. |
Publication type
-
Other Conference Item [20310]