Determination of Optimal Rolling Planning Period for the Management of BIM-Based Construction Supply Chain Processes


METADATA ONLY
Loading...

Date

2022

Publication Type

Conference Paper

ETH Bibliography

yes

Citations

Altmetric
METADATA ONLY

Data

Rights / License

Abstract

Current construction projects often suffer from a lack of synchronization between on-site material requirements and supply. This is at least partially because of the use of a fixed rolling planning period and the length of material lead times. The length of the rolling planning period matters because it affects when materials are ordered. The later the materials are ordered, the higher the chance of having material shortages that will cause progress delays. The earlier the materials are ordered, the higher the chance of having them delivered too early and having to organize storage and keeping track of inventory. This study proposes a methodology to determine the optimal rolling planning period for construction projects, that is, the period that provides the lowest total cost considering unexpected delays in construction progress and the unexpected need to store materials on site. The optimal period was determined using data extracted from a regularly updated building information model (BIM) and a heuristic search algorithm. The methodology is used to plan the raw materials for site-mix concrete for an office building project to be completed in four weeks. It is shown that the methodology can reduce costs related to materials arriving too early or too late on site.

Publication status

published

Book title

Construction Research Congress 2022: Project Management and Delivery, Contracts, and Design and Materials

Journal / series

Volume

Pages / Article No.

263 - 273

Publisher

American Society of Civil Engineers

Event

Construction Research Congress 2022

Edition / version

Methods

Software

Geographic location

Date collected

Date created

Subject

BIM; supply chain optimization; planning; rolling periods; material delivery

Organisational unit

03859 - Adey, Bryan T. / Adey, Bryan T. check_circle
02655 - Netzwerk Stadt u. Landschaft ARCH u BAUG / Network City and Landscape ARCH and BAUG

Notes

Funding

Related publications and datasets