De-aeration of a diversion tunnel of a large scale hydroelectric scheme


METADATA ONLY
Loading...

Date

2004-05-15

Publication Type

Conference Paper

ETH Bibliography

yes

Citations

Altmetric
METADATA ONLY

Data

Rights / License

Abstract

Due to the influence of a varying water level in the main reservoir, the Jökulsá Tunnel as diversion tunnel from a secondary intake is subjected to a transition from free-surface to pressurized flow. As to avoid damage in the main conduit as well as of the hydraulic equipment, the air entrained into and transported downstream by the pressurized flow has to be removed before the junction of the two tunnel branches. A novel concept of de-aeration, basically consisting of vertical drill holes distributed along the Jökulsá Tunnel, was developed and technical feasibility ascertained by means of two physical hydraulic models. A concise description of the concept itself as well as of the modeling procedures is given.

Publication status

published

External links

Book title

Hydraulics of Dams and River Structures

Journal / series

Volume

Pages / Article No.

17 - 24

Publisher

CRC Press

Event

International Conference on Hydraulics of Dams and River Structures 2004

Edition / version

1st Edition

Methods

Software

Geographic location

Date collected

Date created

Subject

Organisational unit

03820 - Boes, Robert / Boes, Robert check_circle

Notes

Funding

Related publications and datasets

Is part of: 10.1201/b16994