Show simple item record

dc.contributor.author
Chen, Qian
dc.contributor.author
Adey, Bryan T.
dc.contributor.author
Haas, Carl T.
dc.contributor.author
Hall, Daniel
dc.date.accessioned
2020-07-08T10:55:25Z
dc.date.available
2020-06-15T13:57:53Z
dc.date.available
2020-06-16T05:42:08Z
dc.date.available
2020-07-08T10:55:25Z
dc.date.issued
2020-06-08
dc.identifier.issn
1471-4175
dc.identifier.issn
1477-0857
dc.identifier.other
10.1108/CI-11-2019-0133
en_US
dc.identifier.uri
http://hdl.handle.net/20.500.11850/420473
dc.description.abstract
Purpose Building information modelling (BIM) and radio frequency identification (RFID) technologies have been extensively explored to improve supply chain visibility and coordination of material flow processes, particularly in the pursuit of Industry 4.0. It remains challenging, however, to effectively use these technologies to enable the precise and reliable coordination of material flow processes. This paper aims to propose a new workflow designed to include the use of detailed look-ahead plans when using BIM and RFID technologies, which can accurately track and match both the dynamic site needs and supply status of materials. Design/methodology/approach The new workflow is designed according to lean theory and is modeled using business process modeling notation. To digitally support the workflow, an integrated BIM-RFID database system is constructed that links information on material demands with look-ahead plans. The new workflow is then used to manage material flows in the erection of an office building with prefabricated columns. The performance of the new workflow is compared with that of a traditional workflow, using discrete event simulations. The input for the simulations was derived from expert opinion in semi-structured interviews. Findings The new workflow enables contractors to better observe on-site status and differences between the actual and planned material requirements, as well as to alert suppliers if necessary. The simulation results indicate that the new workflow has the potential to reduce the duration of the material flow processes by 16.1% compared with the traditional workflow. Research limitations/implications The new workflow is illustrated using a real-world-like situation with input data based on expert opinion. Although the workflow shows potential, it should be tested on a real-world site. Practical implications The new workflow allows project participants to combine detailed near-term look-ahead plans with BIM and RFID technologies to better manage material flow processes. It is particularly useful for the management of engineer-to-order components considering the dynamic site progress. Originality/value The research improves on existing research focused on using BIM and RFID technologies to improve material flow processes by showing how the workflow can be adapted to use detailed look-ahead plans. It reinforces data-driven construction material management practices through improved visibility and reliability in planning and control of material flow processes. (© Emerald Publishing Limited 2020,).
en_US
dc.language.iso
en
en_US
dc.publisher
Emerald
en_US
dc.subject
Material flow processes
en_US
dc.subject
Look-ahead planning
en_US
dc.subject
Information exchange
en_US
dc.subject
On-demand delivery
en_US
dc.subject
Supply chain coordination
en_US
dc.subject
Collaborative decision-making
en_US
dc.title
Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies
en_US
dc.type
Journal Article
dc.date.published
2020-06-08
ethz.journal.title
Construction Innovation
ethz.journal.volume
20
en_US
ethz.journal.issue
3
en_US
ethz.pages.start
471
en_US
ethz.pages.end
508
en_US
ethz.identifier.wos
ethz.identifier.scopus
ethz.publication.place
Bingley
en_US
ethz.publication.status
published
en_US
ethz.leitzahl
ETH Zürich::00002 - ETH Zürich::00012 - Lehre und Forschung::00007 - Departemente::02115 - Dep. Bau, Umwelt und Geomatik / Dep. of Civil, Env. and Geomatic Eng.::02604 - Inst. für Bau- & Infrastrukturmanagement / Inst. Construction&Infrastructure Manag.::09624 - Hall, Daniel M. (ehemalig) / Hall, Daniel M. (former)
en_US
ethz.leitzahl
ETH Zürich::00002 - ETH Zürich::00012 - Lehre und Forschung::00007 - Departemente::02115 - Dep. Bau, Umwelt und Geomatik / Dep. of Civil, Env. and Geomatic Eng.::02604 - Inst. für Bau- & Infrastrukturmanagement / Inst. Construction&Infrastructure Manag.::03859 - Adey, Bryan T. / Adey, Bryan T.
en_US
ethz.leitzahl
ETH Zürich::00002 - ETH Zürich::00012 - Lehre und Forschung::00007 - Departemente::02100 - Dep. Architektur / Dep. of Architecture::02655 - Netzwerk Stadt u. Landschaft ARCH u BAUG / Network City and Landscape ARCH and BAUG
*
ethz.leitzahl.certified
ETH Zürich::00002 - ETH Zürich::00012 - Lehre und Forschung::00007 - Departemente::02115 - Dep. Bau, Umwelt und Geomatik / Dep. of Civil, Env. and Geomatic Eng.::02604 - Inst. für Bau- & Infrastrukturmanagement / Inst. Construction&Infrastructure Manag.::09624 - Hall, Daniel M. (ehemalig) / Hall, Daniel M. (former)
en_US
ethz.leitzahl.certified
ETH Zürich::00002 - ETH Zürich::00012 - Lehre und Forschung::00007 - Departemente::02115 - Dep. Bau, Umwelt und Geomatik / Dep. of Civil, Env. and Geomatic Eng.::02604 - Inst. für Bau- & Infrastrukturmanagement / Inst. Construction&Infrastructure Manag.::03859 - Adey, Bryan T. / Adey, Bryan T.
en_US
ethz.date.deposited
2020-06-15T13:58:04Z
ethz.source
FORM
ethz.eth
yes
en_US
ethz.availability
Metadata only
en_US
ethz.rosetta.installDate
2020-07-08T10:55:35Z
ethz.rosetta.lastUpdated
2024-02-02T11:23:06Z
ethz.rosetta.exportRequired
true
ethz.rosetta.versionExported
true
ethz.COinS
ctx_ver=Z39.88-2004&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.atitle=Using%20look-ahead%20plans%20to%20improve%20material%20flow%20processes%20on%20construction%20projects%20when%20using%20BIM%20and%20RFID%20technologies&rft.jtitle=Construction%20Innovation&rft.date=2020-06-08&rft.volume=20&rft.issue=3&rft.spage=471&rft.epage=508&rft.issn=1471-4175&1477-0857&rft.au=Chen,%20Qian&Adey,%20Bryan%20T.&Haas,%20Carl%20T.&Hall,%20Daniel&rft.genre=article&rft_id=info:doi/10.1108/CI-11-2019-0133&
 Search print copy at ETH Library

Files in this item

FilesSizeFormatOpen in viewer

There are no files associated with this item.

Publication type

Show simple item record