Metadata only
Date
2004-05-15Type
- Conference Paper
ETH Bibliography
yes
Altmetrics
Abstract
Due to the influence of a varying water level in the main reservoir, the Jökulsá Tunnel as diversion tunnel from a secondary intake is subjected to a transition from free-surface to pressurized flow. As to avoid damage in the main conduit as well as of the hydraulic equipment, the air entrained into and transported downstream by the pressurized flow has to be removed before the junction of the two tunnel branches. A novel concept of de-aeration, basically consisting of vertical drill holes distributed along the Jökulsá Tunnel, was developed and technical feasibility ascertained by means of two physical hydraulic models. A concise description of the concept itself as well as of the modeling procedures is given. Show more
Publication status
publishedBook title
Hydraulics of Dams and River StructuresPages / Article No.
Publisher
CRC PressEvent
Edition / version
1st EditionOrganisational unit
03820 - Boes, Robert / Boes, Robert
Related publications and datasets
Is part of: https://doi.org/10.1201/b16994
More
Show all metadata
ETH Bibliography
yes
Altmetrics